Risk Assessment
Production Title: A2 Music Video – SWV – I’m so into
you
Crew: Tawania, Jordanah, Shikeera and
Timeira
Cinematographer: Tawania, Jordanah, Shikeera and
Timeira
Date: 25/10/17
The
following potential risks / hazards might be present:
- Floor space
- Tripping hazards
- Low lighting
- Adverse weather / temperatures
- Electrical cords and sockets
- Flammable materials Crowds
- Fatigue
- Traffic
- Water
- Pedestrian interaction/noise
Where present, please list them
below:
Risk
/ Hazard identified
|
Locations
|
People
affected
|
Existing
controls
|
Action
to be taken to reduce risk or hazard
|
Floor space
|
·
Studio
·
TV studio
·
|
Cast and crew
|
N/A
|
Carefully place camera equipment and
props on a stable floor to ensure it doesn’t fall over.
|
Tripping hazards
|
·
Studio
·
TV studio
·
God’s own
junkyard
·
|
Cast and crew
|
N/A
|
Tie all cables up from the camera,
shoot in flat land to minimise the chance of falling.
|
Low lighting
|
·
God’s own
junkyard
·
|
Cast and crew
|
N/A
|
Shoot in well-lit areas with street
lighting
|
Adverse weather / temperatures
|
·
Brick Lane
·
God’s own
junkyard
|
Cast and crew
|
N/A
|
Make sure we are prepared from the day
before so our crew is not left in cold weather all day.
|
Electrical cords and sockets
|
·
Studio
|
Cast and crew
|
Cables are taped down.
|
|
Fatigue
|
|
Cast and crew
|
Regular breaks
|
As we are ‘hiring’ them we will
provide them with food and drinks for energy. However crew will possibly be
tired as were filming all day.
|
Traffic
|
·
Brick Lane
·
God’s own
junkyard
|
Cast and crew
|
N/A
|
We will take train and bus to our
locations. The day before we will check the train’s service to make sure there
is a good service as for buses we can check bus times.
|
Crowds
|
·
Brick Lane
·
Studio
|
Cast and crew
|
N/A
|
Go at off-peak hours therefore there
will be less people.
We will book the studio in advance and
only have the crew and cast in the room.
|
No comments:
Post a Comment